Items where Author is "Ramya, G."

Group by: Item Type | No Grouping
Number of items: 7.

Ramya, G. and Chandrasekaran, M. and Arulmozhi, P. (2022) Optimization of production cost for integrating job shop scheduling with production resources. Materials Today: Proceedings, 37. pp. 1839-1844. ISSN 22147853

Anithakumari, D and Gayathri, S and Ramya, G. (2019) Effect of Technology in Sedentary Lifestyle and its Impact on the Overall Well Being of the it Employees in Chennai. International Journal of Recent Technology and Engineering, 8 (2S8). pp. 1489-1494. ISSN 2277-3878

Ramya, G. and Chandrasekaran, M. and Shankar, E. (2019) Case Study Analysis of Job Shop Scheduling and its Integration with Material Requirement Planning. Materials Today: Proceedings, 16. pp. 1034-1042. ISSN 22147853

Gobinath, S. and Arumugam, C. and Ramya, G. and Chandrasekaran, M. (2014) Optimization of Total Holding Cost in Job Shop Scheduling by Using Hybrid Algorithm. Applied Mechanics and Materials, 591. pp. 176-179. ISSN 1662-7482

Ramya, G. and Chandrasekaran, M. (2014) Shuffled frog leaping algorithm approach to employee timetabling and job shop scheduling. International Journal of Internet Manufacturing and Services, 3 (3). p. 178. ISSN 1751-6048

Ramya, G. and Chandrasekaran, M. (2014) Shuffled frog leaping algorithm approach to employee timetabling and job shop scheduling. International Journal of Internet Manufacturing and Services, 3 (3). p. 178. ISSN 1751-6048

Ramya, G. and Chandrasekaran, M. (2013) Solving Job Shop Scheduling Problem Based on Employee Availability Constraint. Applied Mechanics and Materials, 376. pp. 197-206. ISSN 1662-7482

This list was generated on Wed Mar 12 16:51:16 2025 IST.